Neptune Bulk Terminals / JJM Construction Ltd.

20200107_132621-2.jpg

THE CHALLENGE

After performing a berth deepening in Vancouver Harbour, JJM had 15,000m3 tonnes of wet dredge. They were looking for a way to process the material to reduce the net volume of waste, while managing and treating any waters that were removed.

THE SOLUTION

GRT used our Mobile Dredge Processing Facility to remove the water from the solids, resulting in a dry stackable material that made for more efficient disposal.